Projects

Community District Heating

Location: Alkali Lake, BC
Application: 10 community buildings
Equipment: 3 x 150 kW boilers
Start-up Date: 2019

Biomass boiler heating system

Gas Station

Location: Hazelton, BC
Application: Restaurant & gas station
Equipment: 2 x 100 kW pellet boilers
Start-up Date: 2019

Twin Sisters District Heating

Location: Moberly Lake, BC
Application: Nursery, office & adjacent building
Equipment: 2 x 100 kW pellet boilers
Start-up Date: 2019

Gitanmaxx Car Wash

Location: Hazelton, BC
Application: Commercial car wash
Equipment: 2 x 100 kW pellet boilers
Start-up Date: 2019

Hazelton Mill Site

Location: South Hazelton, BC
Application: Commercial garage & adjacent office space
Equipment: 32 kW pellet boiler
GHG Reduction: 112 t/y Start-up Date: 2016

Confederation College

Location: Thunder Bay, ON
Application: District heating of main campus & research facility
Equipment: 2 x 500 kW wood chip, 150 kW wood chip & pellets, 25 kW pellet, and 50 kW logwood boilers, walking floor freight trailer, 120 m3 of chip storage
GHG Reduction: 1,250 t/y
Start-up Date: 2014

Burns Lake Hockey Arena

Location: Burns Lake, BC
Application: Zamboni hot water, floor & space heating
Equipment: 3 x 60 kW pellet boilers - 20 foot shipping containerized system with auguring feed system, 20 tonne storage & boilers
GHG Reduction: 190 t/y
Start-up Date: 2012

Zajac Children’s Ranch

Location: Mission, BC
Application: Commercial, indoor swimming pool, remote/off-grid
Equipment: 100 kW pellet boiler with 32 tonne silo storage
GHG Reduction: 115 t/y
Start-up Date: 2014

Residential Swimming Pool

Location: Delta, BC
Application: 80,000 litre swimming pool
Equipment: 25 kW pellet boiler with integral pellet storage (160 kg)
GHG Reduction: 14 t/y
Start-up Date: 2015